Repairs to the Precinct


the repair work at the top of Sea Road is part of a trial that the council have organized to redress the surface of the pedestrian precinct. This work will be completed by Tuesday evening 30th September.

The hope is that the concrete surface will be impressed to look like separate paving slabs, and these will be more hard wearing. If the trial is successful, then it is hoped that the whole precinct eventually will be done section by section.

0 comments:

Post a Comment

Note: only a member of this blog may post a comment.

top